Winches / Engineering selection

20 ton Class JM / JK Electric Winch: Operating Cycle

Match layer-specific line pull and rope speed to the loaded travel, starting, braking and rest cycle before choosing a JM / JK winch.

Equipment reference1601866515801Configured for your project
Technical offer defines final specification
REFERENCE PHOTOGRAPHBlue electric drum winch with wound wire rope, drive motor and steel base in a workshop

Blue drum winch with wound rope, drive motor and mounting base. Reference photograph; the visible machine does not establish the selected 20 ton line pull, rope layers or operating duty.

Selection at a glance
20tonnes

Enquiry class; confirm line pull

Equipment enquiry
20 t class JM / JK drum winch
Force basis
Required line pull at the working layer
Motion cycle
Travel, speed, starts and rest periods
Drive and controls
Selected motor, brake and sequence
Prepare my enquiry

Start with your known requirements. Our team can clarify the remaining interfaces.

01

Specification without the guesswork.

Separate the listed product information from the dimensions and responsibilities that need your project input.

Product data

20 ton Class JM / JK Electric Winch: Operating Cycle listed specifications
Equipment class20 t class enquiry; specify rated line pull at an agreed reference drum layer and the force required throughout travel
Model familyJM / JK electric wire rope winch
Line speed optionsArchived options of 10 or 22 m/min; confirm the selected model, drum layer, actual speed schedule and operating cycle
Speed controlInverter control is an option; agree usable speed range, acceleration, deceleration and low-speed duty with the selected drive
Brake typeElectro-hydraulic brake listed; select stopping, holding and control functions for the actual pulling or lifting duty
Wire ropeSteel wire rope; diameter, construction, strength grade, terminations and supplied length specified
Drum storage & travelUsable rope capacity, winding layers, retained wraps and required travel agreed together
Operator controlsPendant, radio remote or control-box buttons; selected arrangement confirmed
Automation optionPLC interface and operating sequence defined when required
Site powerVoltage, phase, frequency, motor power and starting or inverter arrangement confirmed
Working dutyReview load spectrum, starts per hour, running time and rest periods for the selected mechanism
Mounting & rope routeFoundation loads, base dimensions, rope exit and lead sheaves shown on project drawing

Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.

Site interfaces

Operating cycle and load route

Lifting or pulling task, required force, reeving, slopes/resistance, movement distances, rope layers and return path.

Drive and brake duty

Loaded/unloaded timing, speed changes, starts/reversals, holding periods, rest time, ambient conditions and site electrical supply.

Fixed installation and controls

Base, anchors, mounting reactions, rope exit/lead sheaves, guarding, operator stations and agreed stop/restart sequence.

Supply scope

Supply responsibilities to confirm
Work packageAgree in the quotation
Selected winch packageDrum, drive, brake, specified controls, rope/terminations and agreed protection functions identified.
Installation interfacesFoundation/support review, base and anchors, rope route, sheaves, guards, electrical supply and connection allocated.
Delivery and commissioningDelivery term, unloading, positioning, installation labour, power connection and commissioning responsibilities defined.
Acceptance and handoverInspection/test basis, operating and control documents, records, training, spares and warranty terms agreed.

This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.

02

Check the job before choosing the equipment.

Provide the actual rope route, force and timing for the busiest operating period. Review the proposed motor, brake and control sequence against that cycle.

Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.

03

Detailed equipment information.

Review the product configuration and purchasing requirements for this equipment.

Turn the operating task into a winch selection brief

Select a JM / JK electric winch from the complete operating cycle. A 20 ton enquiry needs the required rope force at the working drum layer, travel distance and speed, followed by starting, stopping, holding and rest periods. These inputs determine the proposed drive, brake and control arrangement; nominal tonnage or a low-speed/high-speed label alone does not establish suitability.

Family context
JM / JK electric wire-rope drum winch; low-speed and high-speed options are listed
Selection basis
Required pull by drum layer, rope travel, motion timing and braking conditions
Offer to request
Matched winch arrangement, performance schedule, duty review and control sequence

REVIEW SPEED AGAINST DUTY

Compare the proposed JM / JK arrangement against the cycle

Ask for a selected performance schedule rather than assigning a speed or duty rating from the model-family name. The archived 10 and 22 m/min options are not a complete 20 ton configuration.

Pull and speed through the rope layers

For a given drum torque, available line pull decreases as the effective winding radius increases; rope speed also changes with layer for a given drum speed. Ask for the selected pull and speed at the layers used by your travel. State reeving, slopes, resistance and any sheaves when translating the task into required rope force.

Starts, running time and heat

Provide starts and reversals per hour, loaded and unloaded running periods and available rest time. Ask the supplier to review motor, gearbox and brake duty against that schedule. Inverter speed adjustment does not by itself establish suitability for prolonged low-speed operation or repeated heavy starts.

Stopping and stationary holding

Distinguish controlled deceleration from holding a stationary load. Describe load direction, potential overhauling movement and what must happen after a stop or power loss. Lifting service needs a specifically selected lifting, braking and protection arrangement; do not assume a pulling winch is suitable for suspended-load duty.

REFERENCE PHOTOGRAPHS

Read the drive and control views in context

These photographs come from this product’s saved source library. They show visible equipment and components, without confirming the selected rating or complete order configuration.

Blue electric drum winch with wound wire rope, drive motor and steel base in a workshop01 / REFERENCE PHOTOGRAPH

Drum, rope and mounting base

Blue drum winch with wound rope, drive motor and mounting base. Reference photograph; the visible machine does not establish the selected 20 ton line pull, rope layers or operating duty.

Pale electrical enclosures beside a blue winch and red brake assembly in a workshop02 / REFERENCE PHOTOGRAPH

Electrical enclosures and brake assembly

Electrical enclosures and a red brake assembly beside a blue winch. Reference photograph; controller logic, protection functions and the selected brake rating need the order specification.

Blue winch gearbox, wound drum, motor and red brake assembly on wooden supports03 / REFERENCE PHOTOGRAPH

Gear drive and brake arrangement

Gear drive, wound rope drum, motor and brake assembly on wooden supports. Reference photograph; the temporary supports do not establish an approved installation or foundation design.

DEFINE THE CONTROL SEQUENCE

Agree commands, stops and restart behaviour

Describe operator position and visibility along the rope route. State pendant, radio or fixed-station preference, any PLC interface and which station has control. Specify the intended sequence for starting, speed changes, braking and direction reversal.

Ask the supplier to identify applicable limits, emergency-stop functions, interlocks and behaviour after supply loss or a fault. Agree how the operator confirms that the route is clear before restarting. Optional PLC or inverter equipment is part of a selected control design; listing an option does not confirm that a particular protection function is included.

COORDINATE THE FIXED INSTALLATION

Provide the base layout and complete rope route

Show the supporting structure, anchor positions, drum orientation, rope exit, lead sheaves and travel endpoints. Include access for rope inspection, guarding and maintenance. Request selected mounting reactions for structural review; the winch base and anchors must be checked for the governing load directions.

Discuss your winch operating cycle

Henan Mine Crane Group

Agree the winch package and acceptance basis

Use the Supply scope tab to allocate the drum winch, supplied rope and terminations, base and anchors, sheaves, power connection and site installation. Identify the drawings, performance schedule and control description that form the offer.

Agree inspection and testing for the selected application, including the stated reference layer, operating speeds, direction controls and braking functions. Define who supplies test loads, site access and commissioning work. Manuals, training, spare parts and warranty terms belong in the agreed order scope.

Archived supplier reference

Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.

Archived supplier-listing price rangeUS$2,880–2,900per set · MOQ 1 set

Range combines the price tiers shown in the saved listing. Captured 2026-10-11. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.

Show saved supplier price tiers
  • 1-2 setsUS$2,900 / set
  • ≥3 setsUS$2,880 / set

Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗

04

One clear package for your buying team.

Bring engineering, purchasing and the installation team into the same scope before the purchase order.

Your layout is more useful than a generic catalogue.

Show the load and rope route, sheaves, drum orientation, working layers, travel endpoints, base/anchors and operator stations. Add force, speed and timing for each part of the cycle.

Send a drawing for review
YOU PROVIDE

Project brief

Load or working task, layout, operating cycle, destination and timing.

REVIEW TOGETHER

Technical offer

Selected configuration, interface drawing, component schedule and scope exceptions.

Compare like for like. Ask each bidder to identify the selected equipment, operating duty, interfaces and supply boundaries so differences in the offers are visible.
05

Questions before you request a quotation.

How should I compare JM and JK winch proposals?

Compare the selected pull and rope speed at the working layers, usable rope storage, complete motion cycle and proposed motor, gearbox, brake and controls. The model-family label alone is not a performance or duty guarantee.

Are 10 and 22 m/min both confirmed for this 20 ton enquiry?

They are options in the archived family description. Request the selected model and pull/speed schedule by drum layer for the actual rope length, operating cycle and power supply.

Does inverter control make every low-speed duty suitable?

No. State the required speed range, duration of low-speed running, loaded starts and rest periods. The selected motor cooling, drive control and brake duty need to be reviewed against that cycle.

Can a pulling winch be used for suspended loads?

Only a specifically selected arrangement suitable for the lifting application should be considered. Confirm load direction, reeving, stopping and holding functions, behaviour after power loss, protection and the applicable inspection/test basis in the technical offer.

Is US$2,880–2,900 a current project price?

The saved listing captured 2026-10-11 shows US$2,900 per set for one or two sets and US$2,880 per set for at least three. These historical tiers do not establish the selected winch specification or current delivered price. Request a quotation with the agreed equipment and site-service scope.

20 tonWinches
Request a quotation

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…