Operating cycle and load route
Lifting or pulling task, required force, reeving, slopes/resistance, movement distances, rope layers and return path.
Match layer-specific line pull and rope speed to the loaded travel, starting, braking and rest cycle before choosing a JM / JK winch.

Blue drum winch with wound rope, drive motor and mounting base. Reference photograph; the visible machine does not establish the selected 20 ton line pull, rope layers or operating duty.
Enquiry class; confirm line pull
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Equipment class | 20 t class enquiry; specify rated line pull at an agreed reference drum layer and the force required throughout travel |
|---|---|
| Model family | JM / JK electric wire rope winch |
| Line speed options | Archived options of 10 or 22 m/min; confirm the selected model, drum layer, actual speed schedule and operating cycle |
| Speed control | Inverter control is an option; agree usable speed range, acceleration, deceleration and low-speed duty with the selected drive |
| Brake type | Electro-hydraulic brake listed; select stopping, holding and control functions for the actual pulling or lifting duty |
| Wire rope | Steel wire rope; diameter, construction, strength grade, terminations and supplied length specified |
| Drum storage & travel | Usable rope capacity, winding layers, retained wraps and required travel agreed together |
| Operator controls | Pendant, radio remote or control-box buttons; selected arrangement confirmed |
| Automation option | PLC interface and operating sequence defined when required |
| Site power | Voltage, phase, frequency, motor power and starting or inverter arrangement confirmed |
| Working duty | Review load spectrum, starts per hour, running time and rest periods for the selected mechanism |
| Mounting & rope route | Foundation loads, base dimensions, rope exit and lead sheaves shown on project drawing |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Lifting or pulling task, required force, reeving, slopes/resistance, movement distances, rope layers and return path.
Loaded/unloaded timing, speed changes, starts/reversals, holding periods, rest time, ambient conditions and site electrical supply.
Base, anchors, mounting reactions, rope exit/lead sheaves, guarding, operator stations and agreed stop/restart sequence.
| Work package | Agree in the quotation |
|---|---|
| Selected winch package | Drum, drive, brake, specified controls, rope/terminations and agreed protection functions identified. |
| Installation interfaces | Foundation/support review, base and anchors, rope route, sheaves, guards, electrical supply and connection allocated. |
| Delivery and commissioning | Delivery term, unloading, positioning, installation labour, power connection and commissioning responsibilities defined. |
| Acceptance and handover | Inspection/test basis, operating and control documents, records, training, spares and warranty terms agreed. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Provide the actual rope route, force and timing for the busiest operating period. Review the proposed motor, brake and control sequence against that cycle.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
Select a JM / JK electric winch from the complete operating cycle. A 20 ton enquiry needs the required rope force at the working drum layer, travel distance and speed, followed by starting, stopping, holding and rest periods. These inputs determine the proposed drive, brake and control arrangement; nominal tonnage or a low-speed/high-speed label alone does not establish suitability.
REVIEW SPEED AGAINST DUTY
Ask for a selected performance schedule rather than assigning a speed or duty rating from the model-family name. The archived 10 and 22 m/min options are not a complete 20 ton configuration.
For a given drum torque, available line pull decreases as the effective winding radius increases; rope speed also changes with layer for a given drum speed. Ask for the selected pull and speed at the layers used by your travel. State reeving, slopes, resistance and any sheaves when translating the task into required rope force.
Provide starts and reversals per hour, loaded and unloaded running periods and available rest time. Ask the supplier to review motor, gearbox and brake duty against that schedule. Inverter speed adjustment does not by itself establish suitability for prolonged low-speed operation or repeated heavy starts.
Distinguish controlled deceleration from holding a stationary load. Describe load direction, potential overhauling movement and what must happen after a stop or power loss. Lifting service needs a specifically selected lifting, braking and protection arrangement; do not assume a pulling winch is suitable for suspended-load duty.
REFERENCE PHOTOGRAPHS
These photographs come from this product’s saved source library. They show visible equipment and components, without confirming the selected rating or complete order configuration.
01 / REFERENCE PHOTOGRAPHBlue drum winch with wound rope, drive motor and mounting base. Reference photograph; the visible machine does not establish the selected 20 ton line pull, rope layers or operating duty.
02 / REFERENCE PHOTOGRAPHElectrical enclosures and a red brake assembly beside a blue winch. Reference photograph; controller logic, protection functions and the selected brake rating need the order specification.
03 / REFERENCE PHOTOGRAPHGear drive, wound rope drum, motor and brake assembly on wooden supports. Reference photograph; the temporary supports do not establish an approved installation or foundation design.
DEFINE THE CONTROL SEQUENCE
Describe operator position and visibility along the rope route. State pendant, radio or fixed-station preference, any PLC interface and which station has control. Specify the intended sequence for starting, speed changes, braking and direction reversal.
Ask the supplier to identify applicable limits, emergency-stop functions, interlocks and behaviour after supply loss or a fault. Agree how the operator confirms that the route is clear before restarting. Optional PLC or inverter equipment is part of a selected control design; listing an option does not confirm that a particular protection function is included.
COORDINATE THE FIXED INSTALLATION
Show the supporting structure, anchor positions, drum orientation, rope exit, lead sheaves and travel endpoints. Include access for rope inspection, guarding and maintenance. Request selected mounting reactions for structural review; the winch base and anchors must be checked for the governing load directions.
Discuss your winch operating cycleHenan Mine Crane Group
Use the Supply scope tab to allocate the drum winch, supplied rope and terminations, base and anchors, sheaves, power connection and site installation. Identify the drawings, performance schedule and control description that form the offer.
Agree inspection and testing for the selected application, including the stated reference layer, operating speeds, direction controls and braking functions. Define who supplies test loads, site access and commissioning work. Manuals, training, spare parts and warranty terms belong in the agreed order scope.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
Range combines the price tiers shown in the saved listing. Captured 2026-10-11. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Show the load and rope route, sheaves, drum orientation, working layers, travel endpoints, base/anchors and operator stations. Add force, speed and timing for each part of the cycle.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
Compare the selected pull and rope speed at the working layers, usable rope storage, complete motion cycle and proposed motor, gearbox, brake and controls. The model-family label alone is not a performance or duty guarantee.
They are options in the archived family description. Request the selected model and pull/speed schedule by drum layer for the actual rope length, operating cycle and power supply.
No. State the required speed range, duration of low-speed running, loaded starts and rest periods. The selected motor cooling, drive control and brake duty need to be reviewed against that cycle.
Only a specifically selected arrangement suitable for the lifting application should be considered. Confirm load direction, reeving, stopping and holding functions, behaviour after power loss, protection and the applicable inspection/test basis in the technical offer.
The saved listing captured 2026-10-11 shows US$2,900 per set for one or two sets and US$2,880 per set for at least three. These historical tiers do not establish the selected winch specification or current delivered price. Request a quotation with the agreed equipment and site-service scope.