Ladle and lifting-gear drawings
Provide vessel/contents/rigging masses, trunnions, beam/hook connections in mm, tilt attachments and permitted contact positions.
Review ladle connections, separate hook loads and relative movement against the process layout.

Yellow multi-girder bridge viewed from below. Use this corresponding archive view to discuss bridge and mechanism space; the photograph does not establish selected dimensions or hook ratings.
Separate enquiry references; selected ratings to agree
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Main and auxiliary load schedule | 240 t main / 80 t auxiliary enquiry references; separate hook loads at each stage, selected ratings and permitted combinations to agree |
|---|---|
| Complete suspended assembly | Ladle shell/lining, maximum contents, lifting beam, attachments and rigging; define the rated-load basis for each load case |
| Ladle and lifting interfaces | Trunnion geometry, beam and hook connections in mm, tilt attachments and permitted contact positions from the actual ladle drawing |
| Process route and orientation | Pickup, furnace/transfer, pouring and set-down stations; vessel orientation, tilt path, nearby equipment and restrictions at each stage |
| Relative hook movement | Main/auxiliary hook upper and lower positions in m, relative spacing and levels, useful approaches and clearance along the process route |
| Runway and structural interface | Surveyed rail centres, rail section/level, runway length, supporting drawings and selected wheel loads; family span references are not selected dimensions |
| Operating duty | Load spectrum, transfer/pouring cycle, starts, shifts and holding time; state crane and mechanism classifications under the applicable standard |
| Thermal and environmental exposure | Ambient and radiant heat, source distance, exposure time, dust and splash zones; specify shielding, cooling and component limits by equipment location |
| Controls and coordinated motions | Selected speeds, positioning, operator sightlines, communication, limits and interlocks; define allowed main/auxiliary movements and load-holding requirements |
| Site electrical interface | Actual voltage, frequency and phase, feed arrangement, isolation and cable route; match equipment to the site supply |
| Installation and maintenance access | Delivery/unloading route, erection space, access to trolleys, lifting gear and electrical equipment; allocate supporting structure, rails and site work |
| Supply and acceptance scope | Selected crane package, transport, erection, commissioning, applicable inspections/tests, drawings, manuals, training and contractual support |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Provide vessel/contents/rigging masses, trunnions, beam/hook connections in mm, tilt attachments and permitted contact positions.
Provide each process station, vessel orientation, hook loads, main/auxiliary levels and spacing, tilt envelope and surrounding clearances.
Provide runway/support drawings, duty, thermal exposure, power/isolation, delivery and maintenance access, and equipment/services to include.
| Work package | Agree in the quotation |
|---|---|
| Crane and ladle-gear boundary | Identify bridge/trolleys, hoisting mechanisms, controls and protection functions; allocate the ladle, beam, tilt attachments and rigging. |
| Site infrastructure | Allocate supporting structure, rails, power, isolation and access to the responsible parties, using selected dimensions and wheel loads. |
| Delivery and installation | Agree delivery terms, package data, unloading route, erection equipment, installation and commissioning responsibilities. |
| Acceptance and support | Define applicable interface/function/load checks, records, drawings/manuals, training, spares and contractual warranty/service obligations. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Match the ladle, lifting gear and main/auxiliary hook paths to the intended handling sequence.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
Start with the ladle drawing and the load carried by each hook through the process. This listing uses separate 240 t main and 80 t auxiliary enquiry references, not a combined 320 t capacity. Define the vessel, contents, lifting beam and attachments, then show how the main and auxiliary connections move from pickup through transfer, pouring and set-down. Review the lifting interfaces and available hook space together before agreeing the selected crane arrangement.
LOAD CASES · CONNECTIONS · MOVEMENT
Compare arrangements against the same vessel drawings and operating sequence. A hook-rating pair alone does not define how the crane will handle the ladle.
Record ladle shell and lining, maximum contents, beam, attachments and rigging. Show the load carried by each hook at every stage and ask the selected design to define permitted hook combinations.
Provide trunnion geometry, beam and hook interfaces in mm, attachment details and permitted contact positions. Review fit, relative position and inspection access using the actual vessel and lifting-gear drawings.
Plot main and auxiliary hook levels, spacing and useful travel together with the tilt envelope. Check pickup, transfer, pouring and set-down positions for obstructions and define permitted coordinated movements.
CORRESPONDING ARCHIVE VIEWS
These photographs belong to this product archive. They show equipment and process context; selected dimensions, ratings and ladle connections require the matching technical documents.
01 / ARCHIVE VIEWYellow multi-girder bridge viewed from below. Use this corresponding archive view to discuss bridge and mechanism space; the photograph does not establish selected dimensions or hook ratings.
02 / ARCHIVE VIEWHeavy bridge crane across a steelworks bay. The archive view illustrates bay and equipment context; confirm the actual runway, hook coverage and surrounding process equipment on the project layout.
03 / ARCHIVE VIEWRed casting crane and hook gear in a steelmaking bay. Review the selected ladle, lifting beam and hook connections on their drawings; visible hook gear does not establish an approved interface or load case.
ONE DEFINED EQUIPMENT INTERFACE
State whether the ladle, lifting beam, tilt attachments and rigging are purchaser-provided or included. Request selected hook geometry, relative travel limits, equipment dimensions and wheel loads against the same drawing revisions.
Itemize the bridge/trolleys, separate hoisting mechanisms, controls and agreed protection functions. Allocate supporting structure, rails, power/isolation, unloading, erection and access equipment. Define applicable interface, motion and load tests, commissioning records, manuals and training in the agreed scope.
START WITH THE LADLE DRAWING
Include trunnions, beam and hook connections, attachments, process stations and vessel orientation. Mark hook levels and spacing, clearances and restrictions. Add duty, heat exposure, power and requested site services.
Discuss your ladle-crane interfacesHenan Mine Crane Group
Use consistent equipment references and drawing revisions across the crane, ladle gear and process layout.
Align the complete suspended assembly, separate hook tasks and permitted contact positions with the intended handling sequence.
Review useful hook movement, vessel envelope, runway/support interfaces, heat exposure and access with the responsible project parties.
Define applicable interface checks, functional and load tests, records, drawings, manuals, training and parts identification. State warranty and service obligations in the contract.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
Range combines the price tiers shown in the saved listing. Captured 2026-10-12. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Send the actual ladle and lifting-gear drawings, complete suspended masses and stage-by-stage hook loads. Mark process stations, vessel orientation, hook levels/spacing, tilt envelope and clearances on the bay layout. Include runway/support interfaces, duty, heat exposure, power, access and requested services.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
No. These are separate main and auxiliary enquiry references, not a combined 320 t rating. The selected technical documents must define each rating, allowed load combinations and coordinated movements.
Provide the actual vessel drawing with trunnion geometry, beam and hook connections in mm, tilt attachments and permitted contact positions. Include shell/lining, contents, attachments and rigging masses so the separate hook-load cases can be reviewed.
Show hook upper and lower positions, relative spacing and levels through pickup, transfer, pouring and set-down. Add the vessel orientation, tilt envelope, useful approaches and surrounding equipment. Check permitted movements and clearances on the selected drawing.
No. The 10.5–31.5 m span and discrete 6, 10, 20, 32 and 55 m lift alternatives are supplier family references. Confirm selected useful hook movement and actual site voltage, frequency and phase. Crane and mechanism classifications need the applicable standard; component IP or insulation labels do not establish whole-crane thermal suitability.
The supplier listing captured 2026-10-12 shows US$900,000 per set for 1–2 sets and US$890,000 for at least 3 sets. These are historical quantity tiers, not a current delivered quotation. Request an itemized offer for the selected equipment, ladle-gear interfaces, transport, site work and acceptance services.