Steelmaking / Custom crane application
450t Four-Girder Foundry Crane for Molten-Metal Handling
Henan Mine Crane Group engineered this 450t four-girder, four-rail foundry crane for molten-metal handling at an unnamed steelmaking enterprise. The configuration combines an integrated large-reducer arrangement, whole-frame trolley machining, PLC control and lifecycle safety monitoring.

- Rated lifting capacity
- 450t
- Crane arrangement
- Four girders and four rails
- Application
- Molten-metal handling in steel and iron plants
- Customer
- Unnamed steelmaking enterprise
- Control
- PLC with open industrial Ethernet
- Recorded scope
- Custom equipment and design-feature account
Match the crane to the molten-metal route
Handling molten metal in steelmaking and ironmaking plants is the primary duty of this customised crane. The 450t capacity is paired with a four-girder, four-rail arrangement for a large-span electric-furnace steelmaking application. The equipment brings structural design, motion control and monitoring into the same foundry-duty specification.
For a comparable project, begin with the full suspended load: vessel, contents and lifting attachment. Map the route from pick-up to refining or pouring and identify where an auxiliary movement is needed. Those details let the engineering team assess hook access, mechanism arrangement and the operating sequence against the actual bay.
Integrated reducer layout and whole-frame machining
The crane uses an integrated large-reducer layout within its four-girder, four-rail architecture. The trolley frame is annealed as a complete assembly and machined as a whole. These manufacturing choices support the assembly accuracy and running stability required when moving a heavy process vessel.
When comparing proposals, review how the trolley, reducer and rail arrangement fit together. Include the runway interface, maintenance access and routes for replacing major components. Whole-frame processing is a useful technical discussion point, but it should be evaluated with the proposed inspection and acceptance requirements for your crane.
Coordinate structural and mechanism design
Finite-element modelling forms part of the design calculation. The design approach matches component strength and design life while coordinating the structure with the mechanisms. For a foundry buyer, this connects the load-carrying arrangement to the machinery that starts, moves and stops the suspended vessel.
Your specification should establish the load cases, operating duty and thermal exposure used in that assessment. Supply the intended frequency of loaded movements and the conditions at critical process stations. Agreement on the design basis helps both parties review the structure and mechanisms against the same operating task.
PLC control with a defined path for future integration
Crane-wide PLC control works with an open industrial Ethernet bus. Interfaces are reserved for later intelligent upgrades, allowing future integration to be considered in the control architecture. The delivered scope described here should be evaluated as PLC control and monitoring, with later automation defined as a separate project stage.
The safety-monitoring management system provides real-time safety alarms and lifecycle detection records. Define the conditions your operators and maintenance team need to see, how alarms are acknowledged and which records need to remain accessible. A clear information schedule turns monitoring into a useful operating and maintenance tool.
Build an enquiry around the vessel and bay
A vessel drawing and building section are the most useful starting documents for a 450t-class foundry discussion. They show the relationship between lifting points, hook approaches and available space. The required redundancy and monitoring scope can then be reviewed alongside the process route.
Agree the acceptance basis before finalising the equipment schedule: what must be demonstrated, with which loads and in which operating modes. This project provides a reference for the architecture and manufacturing approach; the final capacity, span, speed and duty for your plant should follow its own documented requirements.
Application photographs
See the equipment and working context.
Photographs and accompanying illustrations from this application report. Open an image for a larger view.
Application reference: Henan Mine Crane Group official application report. Equipment and operating advice for a new project should be specified against your load, process and site.
Start the equipment discussion
Relevant equipment families.
Compare the equipment family with your operating duty. Final attachments, controls and protection follow the application requirements.
Four-girder overhead cranes
Relevant structural family to assess where the duty and runway design call for a four-girder arrangement.
View equipment options ↗Foundry and ladle-handling cranes
Evaluate a dedicated foundry configuration against the vessel, heat exposure and required operating duty.
View equipment options ↗Plan a similar application
Build the specification
around your operation.
Send the ladle and bay information needed to assess a dedicated molten-metal crane:
- Maximum gross suspended load, including vessel, metal and lifting attachment.
- Vessel drawings, lifting-point geometry and any pouring or auxiliary-hook sequence.
- Runway span, rail level, building section and required hook approach.
- Transfer route, cycle frequency and planned operating-duty basis.
- Ambient and radiant temperatures, exposure locations and other process conditions.
- Required redundancy, monitoring, alarm records and plant-control interfaces.
Before you specify
Questions for
your project.
What drawings should I send for a foundry-crane proposal?
Send the vessel and lifting-point drawings, maximum gross load, building section, runway information and a sketch of the complete transfer and pouring route.
How should I define the future automation scope?
Separate the initial PLC and monitoring functions from later integration. Identify plant signals, operating modes, operator responsibilities and the acceptance conditions for each stage.
Which conditions affect the equipment arrangement?
The vessel interface, thermal exposure, duty cycle, hook access, available headroom and required redundancy all affect the assessment alongside the lifting capacity.
Continue exploring

















