Runway and structural support
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.

Hoist trolley seen from below between yellow bridge girders
Listed rated capacity
Start with your known requirements. Our team can clarify the remaining interfaces.
Separate the listed product information from the dimensions and responsibilities that need your project input.
| Matched capacity and mechanism selection | Choose the required hook load from the intended work, including attachments and tackle. For the 20T–50T request range, require an individual equipment schedule stating the offered rating, hoist/trolley arrangement, duty and speeds. Review the selected proposal before comparing prices or fixing the runway inputs. |
|---|---|
| Load cases for the reaction schedule | Describe the regular and exceptional handling cases, load positions, travel portions and operating period. Ask the crane supplier to identify the assumptions used for the reaction and action schedule. The engineer reviewing the runway needs those assumptions with the values, so the schedule can be connected to the selected crane and intended service. |
| Wheel geometry and supplier actions | Request the wheel number and spacing, end-carriage geometry, rail interface and supplier-specified vertical and horizontal actions. Include the applicable crane positions and load combinations, with dimensions in mm and units for each action. The runway engineer needs this schedule tied to the offered crane. |
| Runway and building information | Provide rail-centre span in m, runway layout, levels and available structural or survey documents. Identify beams, rails, connections, obstructions and any building alterations. Have the appointed structural engineer assess the selected supplier inputs against the actual supporting structure and site condition. |
| Geometry under the required task | Give useful hook travel and pickup or landing levels in m, with close-clearance and attachment dimensions in mm. Obtain the selected crane outline and hook approaches on the same revision as the runway inputs. Review the receiving task, upper envelope and side clearances as distinct checks instead of assuming a capacity choice fixes the geometry. |
| Duty and movement requirements | Describe the load distribution, cycle frequency, travel distances and positioning needs. The LH range is described for A3–A4 work; the supplier must assess the actual service and requested capacity. Ask the offer to identify selected duty, movement speeds and controls, with any resulting changes to the outline or runway actions. |
| Comparable quotation and revision control | Compare offers using the same load brief and site information. Require a selected equipment schedule, outline, reaction and action schedule, exclusions and document revision list. Agree who closes structural questions and when changed crane data must be returned for review. Price comparison should follow resolution of material technical differences and scope gaps. |
| Rated load | Complete suspended load including rigging and attachments; confirm each hook and combined load case. |
| Span and travel | Runway rail-centre span, bridge travel, trolley travel and end approaches. |
| Useful lifting height | Required upper and lower hook positions with the load and rigging. |
| Duty and motion speeds | Load spectrum, lifts per hour, shifts, starting frequency and selected lift/travel speeds. |
| Runway and power | Support capacity, wheel reactions, rail geometry, voltage, frequency, phase and power-feed arrangement. |
Listed information supports initial selection. Final dimensions, loads, speeds and components are defined in the project technical offer.
Provide runway rail-centre span, rail section, rail-top level, building clearances and available support drawings. Ask for the selected wheel loads and interface dimensions for review by your structural engineer.
Show pickup and set-down points, required upper and lower hook positions, load dimensions and rigging height. Overall building height alone does not define useful hook travel.
State lifts per hour, travel distances, working shifts, voltage and frequency. Identify dust, corrosion, temperature or any classified hazardous area.
| Work package | Agree in the quotation |
|---|---|
| Crane equipment | Selected bridge, hoist or trolley, travel drives, controls and specified safety functions. |
| Runway and power feed | Rails, supporting steelwork, power-feed system and the allocation of building interfaces. |
| Delivery and installation | Named delivery term, unloading, installation work, local labour and access equipment. |
| Acceptance and handover | Inspection and test plan, records, documentation, training, spare parts and warranty terms. |
This is a scope-planning checklist. Inclusion and responsibility depend on the agreed contract.
Use the complete suspended load, operating cycle and building layout to review the bridge, hoisting arrangement and runway interface.
Use the Site interfaces tab above to check the layout and operating conditions. Record your requirements in the project brief alongside this page.
Review the product configuration and purchasing requirements for this equipment.
Double Girder Overhead Crane. Available rated-load options: 20T complete hook-load request or 30T complete hook-load request or 40T complete hook-load request or 50T complete hook-load request. An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder. Also specified as a double girder bridge crane, this equipment can be configured for the work area and lifting task. A selected bridge, hoist and runway arrangement can serve pickup and set-down points across the workshop while keeping the floor route available for production. Common applications include machine shops and fabrication bays and equipment assembly and maintenance. Select the configuration, working range, controls and supply scope for your operating conditions, then request a current, itemized quotation.
Confirm model, dimensions, duty, power supply, selected options, delivery and installation scope in the current technical offer.
START WITH THE LOAD
An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder. A selected bridge, hoist and runway arrangement can serve pickup and set-down points across the workshop while keeping the floor route available for production. Typical applications include machine shops and fabrication bays, equipment assembly and maintenance, steel and material handling. Compare the proposed configuration with the actual load, reach, duty and site dimensions.
Include the load, slings, lifting beams and attachments. State the load spectrum, lifts per hour, shifts and required lifting and travel speeds.
Provide runway rail centres, upper and lower hook positions, side and end approaches, workpoints and roof or service obstructions.
Share support drawings and site voltage, frequency and phase. Itemize the crane, rails, moving power feed, installation, testing and commissioning.
Saved supplier listing captured 2026-10-12; quantity tiers: 1-2 sets: US$6,300 per set · ≥3 sets: US$5,760 per set. The listing does not establish a current, project-specific or delivered price. Capacity, span and lifting height affect crane size. Hoist type, operating duty and selected speeds affect the mechanism package. Runway rails, supports, power supply and installation may be quoted separately. Shipping, quantity, site conditions and documentation affect the delivered project price.
SEE THE EQUIPMENT
Review these double girder overhead crane photographs alongside the requested operating conditions and layout. Visible equipment is a product-range reference; confirm the ordered configuration in the offer.
01 / DOUBLE GIRDER OVERHEAD CRANE · 01Hoist trolley seen from below between yellow bridge girders. Give complete workpiece and rigging loads, lifting points and the production cycle. If more than one hook or trolley is required, define each task and permitted coordinated load case.
02 / DOUBLE GIRDER OVERHEAD CRANE · 02Red double-girder bridge with green hoist trolley above steel stock. Provide runway centres and levels, roof obstructions, pickup heights and working positions. Check selected hook approaches, hoist or trolley headroom and useful travel.
03 / DOUBLE GIRDER OVERHEAD CRANE · 03Yellow hoist bridge crane inside an assembly hall. Specify motion speeds, power supply and controls. Obtain selected wheel loads and runway actions, then agree support responsibilities, installation, inspection and acceptance requirements.
Specify pendant, radio remote or cabin control only where listed for this model. Confirm operator sight lines, motion speeds, emergency stops and any backup controller in the quoted scope.
COMPARE THE COMPLETE PROPOSAL
Specify the equipment and services you need. Your quotation should identify what is included and what is priced separately.
Choose the equipment and services to include in the quotation. The final offer should state supplier and purchaser responsibilities for each site interface.
SITE DIMENSIONS · DUTY · EQUIPMENT SCOPE
Provide the layout and operating conditions to compare a double girder overhead crane quotation against your actual project.
Discuss your siteHenan Mine Crane Group
Compare itemized quotations with the same equipment, delivery and site-service boundaries.
Confirm 20, 30, 40 and 50 ton, selected mechanisms, control options and required accessories.
List rail or support work, power supply, clearances and purchaser-provided services.
State transport, unloading, erection, testing, commissioning and service parts included in the offer.
Historical supplier-listing information for context. Request a current quotation for your selected configuration and project scope.
Range combines the price tiers shown in the saved listing. Captured 2026-10-12. This is not a current project quotation; capacity, dimensions, options, quantity, delivery and included services affect final price.
Archived supplier-listing reference. The saved price is not a current quotation; confirm configuration, quantity, shipping and included scope. View saved source listing ↗
Bring engineering, purchasing and the installation team into the same scope before the purchase order.
Mark the runway, span, hook positions, columns, machines and load route. Include structural support drawings and the available site power.
Send a drawing for reviewLoad or working task, layout, operating cycle, destination and timing.
Selected configuration, interface drawing, component schedule and scope exceptions.
Inspection, testing and documentation, delivery responsibilities and warranty terms.
An overhead crane carries a suspended load across a building bay on a bridge and moves the hoist along the bridge girder.
Include the rated load, dimensions, operating cycle, site interfaces and required supply scope.
US$5,760–6,300 per set is the saved supplier-listing reference, captured 2026-10-12. Capacity, span and lifting height affect crane size. Hoist type, operating duty and selected speeds affect the mechanism package. Runway rails, supports, power supply and installation may be quoted separately. Shipping, quantity, site conditions and documentation affect the delivered project price. Request a current quotation for the selected configuration, quantity, delivery and services.
Size the crane from the heaviest complete suspended load, including lifting attachments, and provide the work cycle. The selected structure, hoist and duty must match the project requirements.
Capacity, span, lifting height, hoist, duty and controls affect equipment selection. Runway, electrical supply, transport, installation and commissioning depend on the agreed project scope.