Skip to products

The Henan Mine Crane Group product range

Double girder overhead cranes

Explore double girder overhead cranes. Define the complete lifted load, runway span, useful hook travel and operating cycle. Compare the bridge and hoisting arrangement with your building layout and agree the runway, power and installation scope.

Try a starting point:5 tonneLD seriesGantry crane

Double girder overhead cranes

302 products

Yellow double-girder bridge crane above red fabrication equipment.5, 16 and 20 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
5, 16 and 20 ton
Model / arrangement
LH
Span / coverage
Runway rail-centre span, bridge travel, trolley travel and end approaches.
Lift height
Required upper and lower hook positions with the load and rigging.
Yellow bridge cranes above a crowded fabrication workshop10, 16 and 25 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
10, 16 and 25 ton
Model / arrangement
Project configuration
Span / coverage
Runway rail-centre span, bridge travel, trolley travel and end approaches.
Lift height
Required upper and lower hook positions with the load and rigging.
Yellow bridge cranes above a crowded fabrication workshop10, 16 and 25 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
10, 16 and 25 ton
Model / arrangement
Project configuration
Span / coverage
Runway rail-centre span, bridge travel, trolley travel and end approaches.
Lift height
Required upper and lower hook positions with the load and rigging.
Upward view between yellow double girders showing hoist assemblies and rope paths8, 20 and 32 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
8, 20 and 32 ton
Model / arrangement
Project configuration
Span / coverage
Runway rail-centre span, bridge travel, trolley travel and end approaches.
Lift height
Required upper and lower hook positions with the load and rigging.
Yellow double-girder bridge in an assembly hall.5, 16 and 32 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
5, 16 and 32 ton
Model / arrangement
Project configuration
Span / coverage
Runway rail-centre span, bridge travel, trolley travel and end approaches.
Lift height
Required upper and lower hook positions with the load and rigging.
Yellow double-girder bridge in an assembly hall.10 and 25 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
10 and 25 ton
Model / arrangement
LH
Span / coverage
Runway rail-centre span, bridge travel, trolley travel and end approaches.
Lift height
Required upper and lower hook positions with the load and rigging.
Yellow double-girder bridge with blue upper machinery and hook in a concrete-walled bay10, 16, 20 and 25 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
10, 16, 20 and 25 ton
Model / arrangement
Project configuration
Span / coverage
Runway rail-centre span, bridge travel, trolley travel and end approaches.
Lift height
Required upper and lower hook positions with the load and rigging.
Yellow double-girder bridge with blue upper machinery and hook in a concrete-walled bay8, 12 and 20 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
8, 12 and 20 ton
Model / arrangement
LH
Span / coverage
Runway rail-centre span, bridge travel, trolley travel and end approaches.
Lift height
Required upper and lower hook positions with the load and rigging.
Yellow double-girder crane above an equipment manufacturing workshop5, 10 and 25 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
5, 10 and 25 ton
Model / arrangement
Project configuration
Span / coverage
Runway rail-centre span, bridge travel, trolley travel and end approaches.
Lift height
Required upper and lower hook positions with the load and rigging.
Yellow double-girder crane above an equipment manufacturing workshop5, 10 and 25 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
5, 10 and 25 ton
Model / arrangement
Project configuration
Span / coverage
Runway rail-centre span, bridge travel, trolley travel and end approaches.
Lift height
Required upper and lower hook positions with the load and rigging.
Electric hoist trolley with green drive units photographed on a red double-girder bridge.5 and 10 ton

Double girder overhead cranes

Double Girder Overhead Crane

Rated load
5 and 10 ton
Model / arrangement
LH
Span / coverage
Runway rail-centre span, bridge travel, trolley travel and end approaches.
Lift height
Required upper and lower hook positions with the load and rigging.
Yellow double-girder crane above an equipment manufacturing workshop30 ton

Double girder overhead cranes

30 ton Double Girder Overhead Crane

Rated load
30 ton
Model / arrangement
Project configuration
Span / coverage
Runway rail-centre span, bridge travel, trolley travel and end approaches.
Lift height
Required upper and lower hook positions with the load and rigging.

Showing 241–264 of 302 products

Start with the task if you are not sure of the type.

Send what you need to lift, where it moves and your site layout. We can discuss the equipment options and quotation scope.

Discuss your lifting task ↗

Henan Mine Crane Group

Let’s plan your next lift.

Share your site and lifting requirements. Our team will review a suitable configuration.

Loading the inquiry form…